Skip to content
Remodeled bathroom with a glass walk in shower, tiled walls and floor, and an oak vanity with a quartz top

Serving Holden and nearby WV communities

Bathroom Remodeling Holden WV

In Holden's company houses the bathroom was usually carved out of a bedroom or a closed-in back porch long after the house went up. Bathroom remodeling in Holden starts with the floor that room was put on, because it was never meant to carry a tub.

Get Your Free Quote

We'll reach out to schedule a look.

Google Reviews

100%

Licensed & Insured

15 Years

Experience

Quality

Materials

Bathroom Remodeling Project Examples

The kind of bathroom remodeling work we take on across Williamson and the surrounding West Virginia communities.

Get a quote for yours
Example of a finished bathroom remodeling projectExample of a finished bathroom remodeling projectExample of a finished bathroom remodeling project

Excellent on Google

5.0 out of 5 based on 4 reviews

Review us on Google
J

Jack Smith

4 months ago

Had them out after the back steps started going soft underfoot. He came and looked properly before quoting anything, and told me the structure underneath was still sound — so it ended up a smaller job than I had braced myself for. Turned up when he said he would, cleaned up after himself, and the price at the end was the price we agreed. Not much more you can ask for.

Owner replied

S

Skyler White

9 months ago

Called on a Tuesday and had someone out the same week. What I appreciated most was being told straight what needed doing now and what could safely wait until spring. No pressure and no trying to talk me into the bigger version of the job. It has held up fine through the winter since.

T

Trevor Alford

2 months ago

The quote came through itemised and the final bill matched it, which has honestly not been my experience with everyone around here. They worked around an awkward driveway without once making it my problem, and left the place tidier than they found it. Would have them back.

K

Kaleb Withrow

3 weeks ago

Fair price, showed up on time, tidy work. No complaints.

Sample reviews shown for illustration.

See something like yours?

Send a few photos and we'll tell you what it'll take — free written quote, no pressure.

A tub on a floor built for a bedroom

Island Creek Coal built these houses for a way of living that did not include indoor bathrooms as we know them. When one was added, it went onto joists sized for a bedroom or a porch, and those were never meant for a full tub, tile and decades of slow leaks. In a house approaching a century old, framed with untreated lumber, that corner of the floor deserves a proper look.

  • Floor under the tub checked where the room came out of a bedroom

    Floor under the tub checked where the room came out of a bedroom

  • Soft subfloor replaced and support added under a new shower

    Soft subfloor replaced and support added under a new shower

  • Bathrooms on closed-in back porches looked at from below

    Bathrooms on closed-in back porches looked at from below

  • Doors turned to open off the hall rather than another room

    Doors turned to open off the hall rather than another room

  • Casing and doors matched to the house pattern

    Casing and doors matched to the house pattern

Why Choose Mackwood Construction?

What you get when Mackwood does your bathroom remodeling — and what we won't do.

  • Free written quote, itemised before anything starts
  • We get underneath and look properly before quoting — not from the kerb
  • We'll tell you straight if a repair isn't worth doing
  • Based in Williamson — Mingo and Logan counties, about an hour out
  • Straight answers on permits, which differ either side of the county line
  • Built for this climate: drainage, flashing and ground contact done right
  • Clean site, and the offcuts leave with us
Get a Free Quote

Video placeholder — why-choose-video.jpg

How It Works

From first call to finished work — no surprises in between.

  1. A phone held over a workbench beside a notepad sketch of a deck marked up with dimensions — 16 by 12 feet, 36 inch rail, 2x8 pressure-treated joists at 16 inches on centre — with a tape measure and carpenter's pencil alongside

    Step 1

    Tell us about the project

    Call, text, or send a message with what you're looking to build or repair. No form to fill in and no call centre — it comes straight to us, and you'll get a real answer about whether it's something we do.

  2. Kneeling under a deck to inspect the framing, using a flashlight and a probe to test a rotted band board where it meets a support post

    Step 2

    Send photos or schedule a look

    A few photos are often enough to tell us what we're dealing with. Where it isn't — anything structural, anything hidden underneath — we'll come out and look properly before quoting rather than guessing from the kerb.

  3. Going through a printed itemised quote line by line at a kitchen table, a tape measure and carpenter's pencil set down beside it

    Step 3

    Get a clear quote

    You get a written quote that itemises the work, so you can see what you're paying for and what you aren't. If we think part of it isn't worth doing, we'll say so. No pressure and no surprises at the end.

  4. A finished pressure-treated deck with railing and steps on a West Virginia home, being walked through on completion, wooded hillside behind

    Step 4

    We build it right

    We turn up when we said we would, work clean, and haul the offcuts away with us. The job gets built to last in this climate — and we'll walk it with you before we call it finished.

Not sure what your bathroom remodeling needs?

We'll come and look, then tell you straight — including if it isn't worth doing.

Bathroom Remodeling in Holden — common questions

Straight answers to what we get asked most.

My bathroom floor dips by the tub. Is that the leak or the house?

Often both. A bathroom added onto bedroom or porch joists carries more than they were sized for, and a slow leak softens the subfloor on top. We look underneath before quoting so you know which you are paying to fix.

Should the bathroom layout change rather than just getting new tile?

Sometimes. Where the room is badly placed or reached through a bedroom, moving a door or a partition can be worth more than re-tiling it where it is. The plumber confirms what can move first.

Can a shower replace the tub in a company house?

Usually. The drain moves, which is the plumber's part, and we frame, waterproof and tile the shower. In a small camp-house bathroom it often frees enough floor to change how the room works.

Is soft subfloor in the bathroom part of the remodel price?

Yes, replacing soft subfloor is part of the remodel. Failed joists or sills are floor joist repair, and we price those separately and tell you before starting.

Can you match the original detail on a company house?

Usually, and Holden is the best case for it. The houses were built to standard patterns, so the profile you need is generally still visible on the same street. Where something genuinely can't be sourced we'll show you the nearest option rather than substituting quietly.

My neighbour just had the same repair done. Does that mean mine is coming?

Quite possibly. These houses were built the same way at the same time on the same ground, so they tend to reach the same failures together. It's worth a look underneath before it becomes urgent.

The house is dug into the hill and the back is hard to get to. Is that an issue?

It's the normal situation in the camps and it's usually the side the work is on. It affects access and how long material handling takes, not whether the repair can be done properly.

Bathroom Remodeling in other towns

We handle bathroom remodeling across Williamson and the surrounding West Virginia communities.

The full picture

What bathroom remodeling in Holden actually involves

Most people are buying a result, not a list of tasks. Pick a topic to see what we look at before quoting in Holden.

More on bathroom remodeling work in Holden

Water from outside adds to it. These houses are set into the hillside, water off the slope reaches the back and the low side first, and a bathroom on a closed-in back porch sits right there. So the subfloor, the joists and their bearings under the bathroom get checked before anyone picks tile.

Replacing soft subfloor and adding support under a new tub or shower is part of the remodel. Where the joists or sill have failed, that is floor joist repair, priced as a separate job before the bathroom work goes ahead.

Get a free quote for bathroom remodeling in Holden

Tell us what you're building or repairing and get a clear, no-pressure quote. Free quotes, honest answers, and craftsmanship built to last.

  • Free, no-pressure quotes
  • Big and small jobs welcome
  • Clean, detailed work
  • Local — serving Williamson & nearby WV
Call Estimate